综采工作面末采阶段顶板切顶卸压技术应用

Application of Roof Cutting and Pressure Relief Technology in Final Mining Stage of Fully Mechanized Mining Face

  • 摘要: 针对工作面高强度K2灰岩层引发的矿压显现剧烈问题,提出顶板预裂爆破切顶卸压技术,通过在岩层内形成结构弱面减缓矿压影响,优化炮眼垂直高度、倾斜角度及间距等参数,采用深孔聚能爆破工艺与水炮泥封孔技术,实现爆破能量精准释放,构建连续贯通预裂面。现场应用表明:顶板稳定性显著提升,矿压动载系数、支架工作阻力降低,矿压峰值明显下降,作业安全性大幅提升。

     

    Abstract: Aiming at the problem of severe mine pressure behavior caused by the high-strength K2 limestone layer in the working face, a roof presplitting blasting and roof cutting and pressure relief technology is proposed. By forming a weak structural surface in the rock strata to reduce mine pressure impact, optimize parameters such as vertical height, inclination angles, spacings and others of blastholes, deep hole energy gathering blasting technique and water cannon mud hole sealing technology are adopted to achieve precise release of blasting energy and construct a continuous penetration presplitting surface. The on-site application shows that the roof stability is significantly improved, the dynamic load coefficient of mine pressure and the working resistance of the bracket are reduced, the peak value of mine pressure is obviously decreased, and the operational safety is greatly improved.

     

/

返回文章
返回