  • 摘要: 针对兼并重组后矿井生产规模扩大,原供电系统存在电源结构单一、输电能力不足、主变容量受限及井下网络适配性差等问题,引发共因故障风险高、电能质量不稳定、单相接地电流超限等隐患,依据电力系统规划原理实施系统性改造。构建双源独立供电体系,引入两座110 kV轩岗变电站独立供电,升级输电线路截面并架设OPGW光纤地线;新建35 kV主变电所并配置16 000 kVA主变压器,大幅提升系统冗余度与负荷承载能力。同时,配置SVG动态无功补偿装置提高功率因数,采用自动调谐式消弧线圈抑制接地故障残流,基于短路电流计算完成井下供电网络重构。改造后系统全面满足N-1运行要求,功率因数稳定在0.98以上,线路电压降与接地故障电流显著降低,供电可靠性与安全性得到根本性提升,为矿井大型化生产提供了坚实电力保障。

     

    Abstract: In view of the expansion of mine production scale after mergers and restructuring and the existing problems in the original power supply system such as single power structure, insufficient transmission capability, limited main transformer capacity, and poor adaptability of downhole networks, etc, which have led to hidden dangers such as high risk of common cause failures, unstable power quality, excessive single-phase ground current and others, according to the principles of power system planning, a systematic transformation is implemented. A dual source independent power supply system is constructed, two 110 kV Xuangang substations are introduced for independent power supply, the transmission line cross-section is upgraded and OPGW fiber optic ground wire is installed; A new 35 kV main substation is constructed and equipped with a 16 000 kVA main transformer, greatly improving system redundancy and load bearing capacity. Meanwhile, SVG dynamic reactive power compensation device is configured to improve power factor, and automatic tuning arc suppression coil is adopted to suppress residual current of ground faults. Based on short-circuit current calculation, the reconstruction of downhole power supply network is completed. After the transformation, the system fully meets the N-1 operational requirements, with a stable power factor of over 0.98, the line voltage drop and ground fault current are significantly reduced, and the reliability and safety of power supply are fundamentally improved, providing solid power guarantee for large-scale production in mines.

     

/

返回文章
返回