XU Xiaoli, LIU Yongsheng, HAO Qiang. Optimization and Practice on Advanced Pre-splitting Scheme for Fault Broken ZoneJ. Shandong Coal Science and Technology, 2026, 44(2): 49-53, 59. DOI: 10.3969/j.issn.1005-2801.2026.02.010
Citation: XU Xiaoli, LIU Yongsheng, HAO Qiang. Optimization and Practice on Advanced Pre-splitting Scheme for Fault Broken ZoneJ. Shandong Coal Science and Technology, 2026, 44(2): 49-53, 59. DOI: 10.3969/j.issn.1005-2801.2026.02.010

Optimization and Practice on Advanced Pre-splitting Scheme for Fault Broken Zone

  • Aiming at the difficult problems of severe pick loss, large difficulty in rock-breaking, low stoping efficiency and others during the period of stoping passing through faults, taking the 31130 coal mining working face stoping passing through the F3 fault of Xiezhuang Coal Mine as the research object. The advanced pre-splitting stoping process is adopted, through joint technical schemes such as "exposing fault research map+optimizing blasthole layout+endoscope observation", etc, precise "what is cut is what is blasted" is achieved. The application effect shows that after adopting the advanced pre-splitting technology, the stoping efficiency is improved by 67%, the pick loss of the shearer is reduced by 75%, and the large-scale roof fragmentation and roof collapse are avoided.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return